When copying from a previous project, sort the list of jobs by the bid date (and show the bid date).
When copying from a previous project, sort the list of jobs by the bid date (and show the bid date). Another option would be having a field or two that the user could pick from to help them home in on the project they want to copy (i.e. state, bid date, etc.)
3
votes
Kevin Meise
shared this idea